Press "Enter" to skip to content

Come back Pinheiros | Ricardo Souto Chiaretti | TEDxKids@PortoSeguroSchool


[Music]

in the right place, hi, you’ve got Ricardo and

today I will talk about the pine river

The reason I say the river is because

I’m a member of the pines and also

because he was a problem germania

but after the second

world war had to change its name

who chose the sport club pines

in tribute to the river pass there that was

used for recreation by its members

here shows the river pines today in blue

as it was formerly but because the river

pines and so today it has not started in

20’s are paulo that he is very

fast and with it the factories and they

needed more electricity

then a Canadian company called

light got the right to sell

electric power for the city

the geography student of the place they

to build a hydroelectric plant in Cubatão

taking advantage of the 700 meters fall

of sea water to supply the

they build a reservoir in the

high mountain range called rio grande

Good now, when we go to the beach.

Do you already know what those tubes are?

who are on the good scene and give a

resolved power problem

huh

sakineh because in winter almost no

the level of the reservoir is

very low and there was

then the sole engineer

of life called called the environments

said let’s use the pine river

So now everything will be fine without

complications even though the course of the river

Pine did not go to the mountain of the sea and is

for indoor jack reverser

now is going to work, too, because the

pines was very crooked he did not

I could do nothing like that.

So, as

the saw project that took more than 20

years and when completed had river

pines that built and two mills

of treachery and pear

also serves as a type of dam

to dam the large river that are in

environments in tribute to the engineer who

rectified the Pines River

but with the river pines certificate not

had more flood on its banks and the

The terrain started to be highly valued

and occupation ended up being fast and without

investment then sewage ends up seeing

without first treatment

He started to look beautiful.

even today with the sabesp leaving

enough for the collection and treatment of

industrial sewage still 400,000 families

families toss their tastes into treatment

pines, and because of this ,

90 it is no longer used and the

hydropower only works with 25 per

cent of its capacity as all

we know today the rio pines is a place

very polluted and caused several problems

like bad fair

in summer the appearance of these algae

increase the number of mosquitoes that

diseases such as dengue and zica and

the contact with its waters also

other diseases such as

hepatitis cholera infections

but what benefit would we have

showers were cleaned well

some of them would be the hydroelectric

100% of its capacity.

capacity again we could

swimming and playing in the river conditions I

I have for him

we could make transportation

people and cargo by the river is tourism and

also because not fishing in the river

I would have life again but what we can

do for the river pines today we do not

We should throw garbage on the street on the

goes to the wolf’s mouth and then ends up going

pro pines and the most important river is

slowly but will

next year there are elections we should

to vote on candidates who commit themselves

with the pines working for the

urbanization of irregular constructions

and the collection and collection

sewage treatment for the whole

Sao Paulo

Now I’m going to show you a video that shows

Some dreams that I have of Rio 2010

and the community book

this was the presentation also had

liked thanks

”

Be First to Comment

Leave a Reply

Your email address will not be published. Required fields are marked *