Press "Enter" to skip to content

Super Pipeline | National Geographic


is one of the North Sea’s largest

is one of the North Sea’s largest underwater gasping it’s called Northern

underwater gasping it’s called Northern

underwater gasping it’s called Northern Light at 40 kilometers long and ten

Light at 40 kilometers long and ten

Light at 40 kilometers long and ten kilometers wide and containing over 300

kilometers wide and containing over 300

kilometers wide and containing over 300 billion cubic meters of gas

billion cubic meters of gas

billion cubic meters of gas it’s simply massive but it’s locked in

it’s simply massive but it’s locked in

it’s simply massive but it’s locked in an icy to 3000 metres below the surface

an icy to 3000 metres below the surface

an icy to 3000 metres below the surface so deep and so remote that it’s

so deep and so remote that it’s

so deep and so remote that it’s considered beyond the reach of man and

considered beyond the reach of man and

considered beyond the reach of man and machine and that is until the engineers

machine and that is until the engineers

machine and that is until the engineers at norske drove the Norwegian energy

at norske drove the Norwegian energy

at norske drove the Norwegian energy company decided it’s just too tempting

company decided it’s just too tempting

company decided it’s just too tempting to ignore me because there is enough gas

to ignore me because there is enough gas

to ignore me because there is enough gas to supply 20 percent of Great Britain’s

to supply 20 percent of Great Britain’s

to supply 20 percent of Great Britain’s gas needs for 40 years it will take 10

gas needs for 40 years it will take 10

gas needs for 40 years it will take 10 years and cost ten billion dollars first

years and cost ten billion dollars first

years and cost ten billion dollars first they’ll drill the Ormen Lange gas

they’ll drill the Ormen Lange gas

they’ll drill the Ormen Lange gas deposit transport the gas 120 kilometres

deposit transport the gas 120 kilometres

deposit transport the gas 120 kilometres to one of Norway’s largest processing

to one of Norway’s largest processing

to one of Norway’s largest processing plants at nyhamna then sent the

plants at nyhamna then sent the

plants at nyhamna then sent the processed gas to the UK down the

processed gas to the UK down the

processed gas to the UK down the Langlade pipeline a staggering 1,200

Langlade pipeline a staggering 1,200

Langlade pipeline a staggering 1,200 kilometres the pipes are each 12 metres

kilometres the pipes are each 12 metres

kilometres the pipes are each 12 metres long and weigh 10 tons with another 10

long and weigh 10 tons with another 10

long and weigh 10 tons with another 10 tons of concrete and metal is added to

tons of concrete and metal is added to

tons of concrete and metal is added to give them enough weight to stay on the

give them enough weight to stay on the

give them enough weight to stay on the ocean floor each of the 100,000 pipes is

ocean floor each of the 100,000 pipes is

ocean floor each of the 100,000 pipes is numbered as it comes out of the plan

numbered as it comes out of the plan

numbered as it comes out of the plan destined for a specific location in the

destined for a specific location in the

destined for a specific location in the line the pipe laying itself is a

line the pipe laying itself is a

line the pipe laying itself is a monstrous job once the pipe is being

monstrous job once the pipe is being

monstrous job once the pipe is being manufactured it is placed onto the

manufactured it is placed onto the

manufactured it is placed onto the supply ships for delivery to the pipe

supply ships for delivery to the pipe

supply ships for delivery to the pipe laying barge the lb 200

laying barge the lb 200

laying barge the lb 200 the barges huge longer than two football

the barges huge longer than two football

the barges huge longer than two football fields

fields

fields it’s an enormous floating steel welding

it’s an enormous floating steel welding

it’s an enormous floating steel welding factory which has to work with military

factory which has to work with military

factory which has to work with military precision the pipeline is built as a

precision the pipeline is built as a

precision the pipeline is built as a continuous tool it has dropped from the

continuous tool it has dropped from the

continuous tool it has dropped from the ship to the seabed if the ship halts for

ship to the seabed if the ship halts for

ship to the seabed if the ship halts for too long the strain on the pipe could

too long the strain on the pipe could

too long the strain on the pipe could snap this is no ordinary welding

snap this is no ordinary welding

snap this is no ordinary welding operation the process involves a special

operation the process involves a special

operation the process involves a special welding machine with eight heads per

welding machine with eight heads per

welding machine with eight heads per station

passing through each of the welding

passing through each of the welding stations in seven minutes the pipe is

stations in seven minutes the pipe is

stations in seven minutes the pipe is then checked by an ultrasound machine if

then checked by an ultrasound machine if

then checked by an ultrasound machine if applause detected it has to be repaired

applause detected it has to be repaired

applause detected it has to be repaired immediately before moving to the next

immediately before moving to the next

immediately before moving to the next station after all the welding stations

station after all the welding stations

station after all the welding stations have linked the pipe the final step of

have linked the pipe the final step of

have linked the pipe the final step of the operation is to seal the exposed

the operation is to seal the exposed

the operation is to seal the exposed metal

it is covered in a protective heat

it is covered in a protective heat shrunk plastic without this the steel

shrunk plastic without this the steel

shrunk plastic without this the steel pipe is broken

the most critical step of the operation

the most critical step of the operation offloading the pipe to the seafloor

offloading the pipe to the seafloor

as the pipe enters the ocean it begins

as the pipe enters the ocean it begins to sack and pressure is put on the

to sack and pressure is put on the

to sack and pressure is put on the entire pipeline which is free hanging

entire pipeline which is free hanging

entire pipeline which is free hanging beneath the ship without exactly the

beneath the ship without exactly the

beneath the ship without exactly the right tension the fight could snap like

right tension the fight could snap like

right tension the fight could snap like a matchstick the pipe comes off the back

a matchstick the pipe comes off the back

a matchstick the pipe comes off the back of the barge who must call a lazy-s

of the barge who must call a lazy-s

of the barge who must call a lazy-s configuration that s of unsupported pipe

configuration that s of unsupported pipe

configuration that s of unsupported pipe has to be kept from just buckling under

has to be kept from just buckling under

has to be kept from just buckling under its own weight

its own weight

its own weight so to keep it under control you’ve got

so to keep it under control you’ve got

so to keep it under control you’ve got to keep that under a huge tension to

to keep that under a huge tension to

to keep that under a huge tension to stop it from just collapsing under its

stop it from just collapsing under its

stop it from just collapsing under its own weight as the pipe is lowered the

own weight as the pipe is lowered the

own weight as the pipe is lowered the barge moves forward 24 meters not a

barge moves forward 24 meters not a

barge moves forward 24 meters not a meter more with this well-oiled

meter more with this well-oiled

meter more with this well-oiled operation the lb 200 is able to lay over

operation the lb 200 is able to lay over

operation the lb 200 is able to lay over 100 kilometres of pipeline a month

”

Be First to Comment

Leave a Reply

Your email address will not be published. Required fields are marked *