Press "Enter" to skip to content

Securing Lumber Stores (Deleted Scene) | Life Below Zero


it’s too hot out here first t-shirt day

it’s too hot out here first t-shirt day of the year

of the year

of the year word is the rivers been moving upstream

word is the rivers been moving upstream

word is the rivers been moving upstream of me so I’m expecting today sometime

of me so I’m expecting today sometime

of me so I’m expecting today sometime today maybe as late as early tomorrow

today maybe as late as early tomorrow

today maybe as late as early tomorrow morning but not a lot of time to get the

morning but not a lot of time to get the

morning but not a lot of time to get the last finishing touches done here it’s

last finishing touches done here it’s

last finishing touches done here it’s kind of nice to know that it is moving

kind of nice to know that it is moving

kind of nice to know that it is moving it has put some urgency into what I’m

it has put some urgency into what I’m

it has put some urgency into what I’m doing I know there’s still some projects

doing I know there’s still some projects

doing I know there’s still some projects that need to get done and and I got a

that need to get done and and I got a

that need to get done and and I got a kick butt and get them done right now

kick butt and get them done right now

kick butt and get them done right now because I know it’s coming so the job at

because I know it’s coming so the job at

because I know it’s coming so the job at hand right now is to get these logs all

hand right now is to get these logs all

hand right now is to get these logs all tied together this is about two weeks

tied together this is about two weeks

tied together this is about two weeks worth of cutting trees and hauling trees

worth of cutting trees and hauling trees

worth of cutting trees and hauling trees in and this will all be raw materials

in and this will all be raw materials

in and this will all be raw materials for use with my sawmill the big fear I

for use with my sawmill the big fear I

for use with my sawmill the big fear I have is I got a little hell of a lot of

have is I got a little hell of a lot of

have is I got a little hell of a lot of work invested in these logs and I don’t

work invested in these logs and I don’t

work invested in these logs and I don’t want them to float away so I think what

want them to float away so I think what

want them to float away so I think what I want to try and do is get get some

I want to try and do is get get some

I want to try and do is get get some nails driven into these run rope around

nails driven into these run rope around

nails driven into these run rope around them connect them all up get them tied

them connect them all up get them tied

them connect them all up get them tied off to a tree or something so they can’t

off to a tree or something so they can’t

off to a tree or something so they can’t float away and then I’ll do the same

float away and then I’ll do the same

float away and then I’ll do the same with that pile over there

with that pile over there

with that pile over there in 2009 I had enough logs to build a

in 2009 I had enough logs to build a

in 2009 I had enough logs to build a house and they all went away in about 12

house and they all went away in about 12

house and they all went away in about 12 hours that was a hard lesson learned so

hours that was a hard lesson learned so

hours that was a hard lesson learned so I don’t want to lose these it’s pretty

I don’t want to lose these it’s pretty

I don’t want to lose these it’s pretty hard to put a value on stuff like this

hard to put a value on stuff like this

hard to put a value on stuff like this but you know this is thousands of

but you know this is thousands of

but you know this is thousands of dollars worth of lumber I know that for

dollars worth of lumber I know that for

dollars worth of lumber I know that for me it’s the time I put into it

me it’s the time I put into it

me it’s the time I put into it time and calories

so I need to do now is just take a line

so I need to do now is just take a line staple it onto all the logs go back over

staple it onto all the logs go back over

staple it onto all the logs go back over staple it up the other way that should

staple it up the other way that should

staple it up the other way that should tie them together

one of the projects I have for this

one of the projects I have for this summer in addition to finishing this

summer in addition to finishing this

summer in addition to finishing this house is putting up a couple of yurts

house is putting up a couple of yurts

house is putting up a couple of yurts one of them will be one that’ll be for

one of them will be one that’ll be for

one of them will be one that’ll be for my clients but the other one will be

my clients but the other one will be

my clients but the other one will be basically a workshop 24 foot diameter

basically a workshop 24 foot diameter

basically a workshop 24 foot diameter workshop so I have a good place to work

workshop so I have a good place to work

workshop so I have a good place to work in the winter you don’t usually get

in the winter you don’t usually get

in the winter you don’t usually get trees this big

trees this big

trees this big I had to hunt around quite a while to

I had to hunt around quite a while to

I had to hunt around quite a while to find trees this big around here pretty

find trees this big around here pretty

find trees this big around here pretty valuable these big guys right here are

valuable these big guys right here are

valuable these big guys right here are pretty valuable to me I don’t want to

pretty valuable to me I don’t want to

pretty valuable to me I don’t want to lose them

no if that’ll stop it from floating away

no if that’ll stop it from floating away or not but maybe there’s a little bit of

or not but maybe there’s a little bit of

or not but maybe there’s a little bit of peace of mind that it might slow it down

peace of mind that it might slow it down

peace of mind that it might slow it down anyway I think if I fled to the point

anyway I think if I fled to the point

anyway I think if I fled to the point where all these logs are floating and

where all these logs are floating and

where all these logs are floating and all this material here is floating I’m

all this material here is floating I’m

all this material here is floating I’m in big trouble I’ll probably have a lot

in big trouble I’ll probably have a lot

in big trouble I’ll probably have a lot bigger worries than a few logs floating

bigger worries than a few logs floating

bigger worries than a few logs floating away at that point I think that’s good

”

Be First to Comment

Leave a Reply

Your email address will not be published. Required fields are marked *