
in the right place, hi, you’ve got Ricardo and
today I will talk about the pine river
The reason I say the river is because
I’m a member of the pines and also
because he was a problem germania
but after the second
world war had to change its name
who chose the sport club pines
in tribute to the river pass there that was
used for recreation by its members
here shows the river pines today in blue
as it was formerly but because the river
pines and so today it has not started in
20’s are paulo that he is very
fast and with it the factories and they
needed more electricity
then a Canadian company called
light got the right to sell
electric power for the city
the geography student of the place they
to build a hydroelectric plant in Cubatão
taking advantage of the 700 meters fall
of sea water to supply the
they build a reservoir in the
high mountain range called rio grande
Good now, when we go to the beach.
Do you already know what those tubes are?
who are on the good scene and give a
resolved power problem
huh
sakineh because in winter almost no
the level of the reservoir is
very low and there was
then the sole engineer
of life called called the environments
said let’s use the pine river
So now everything will be fine without
complications even though the course of the river
Pine did not go to the mountain of the sea and is
for indoor jack reverser
now is going to work, too, because the
pines was very crooked he did not
I could do nothing like that.
So, as
the saw project that took more than 20
years and when completed had river
pines that built and two mills
of treachery and pear
also serves as a type of dam
to dam the large river that are in
environments in tribute to the engineer who
rectified the Pines River
but with the river pines certificate not
had more flood on its banks and the
The terrain started to be highly valued
and occupation ended up being fast and without
investment then sewage ends up seeing
without first treatment
He started to look beautiful.
even today with the sabesp leaving
enough for the collection and treatment of
industrial sewage still 400,000 families
families toss their tastes into treatment
pines, and because of this ,
90 it is no longer used and the
hydropower only works with 25 per
cent of its capacity as all
we know today the rio pines is a place
very polluted and caused several problems
like bad fair
in summer the appearance of these algae
increase the number of mosquitoes that
diseases such as dengue and zica and
the contact with its waters also
other diseases such as
hepatitis cholera infections
but what benefit would we have
showers were cleaned well
some of them would be the hydroelectric
100% of its capacity.
capacity again we could
swimming and playing in the river conditions I
I have for him
we could make transportation
people and cargo by the river is tourism and
also because not fishing in the river
I would have life again but what we can
do for the river pines today we do not
We should throw garbage on the street on the
goes to the wolf’s mouth and then ends up going
pro pines and the most important river is
slowly but will
next year there are elections we should
to vote on candidates who commit themselves
with the pines working for the
urbanization of irregular constructions
and the collection and collection
sewage treatment for the whole
Sao Paulo
Now I’m going to show you a video that shows
Some dreams that I have of Rio 2010
and the community book
this was the presentation also had
liked thanks
”
Be First to Comment